top of page

Auric Mining supercharges WA gold growth with 68Koz Iron Maiden deal

Writer: Murray Ward
Murray Ward
2 hours ago
3 min read
Auric supercharges WA gold growth with 68Koz Iron Maiden deal
Auric Mining is set to acquire the Iron Maiden gold project, 180km south of its Burbanks processing facility in Western Australia. Credit: File

 

 

Auric Mining (ASX: AWJ) has inked a deal to snap up the Iron Maiden gold project near Norseman in WA, adding a historical gold resource to its growing portfolio and potentially bolstering the ore feed pipeline for its Burbanks processing facility, currently undergoing refurbishment.

 

Under the deal, Auric will fork out an initial $1 million in cash to acquire project owner Boomerang Mining Capital, alongside repaying up to $3 million in loans used to fund the original purchase from Accent Resources.

 

A further $1 million deferred payment to Accent will be guaranteed by Auric, while the vendors could pocket another $2 million in milestone payments if Auric manages to grow the project's JORC 2012-compliant gold resource to 150,000 ounces and then 300,000 ounces.

 

The asset includes a historical JORC 2004-compliant mineral resource of 1.4 million tonnes grading 1.5 grams per tonne (g/t) gold, equivalent to 68,500 ounces.

 

The Iron Maiden project sits just five kilometres south of the historic Norseman mining hub and 180km from Auric’s Burbanks gold processing facility, placing it well within economic haulage distance. The company says 75 per cent of the gold mineralisation sits within 50 metres of the surface, suggesting the potential for low-cost, open-pit extraction.

 

While historical, Iron Maiden's database contains some eye-catching high-grade intercepts pointing to significant exploration upside. Previous drilling at the project's Iron Duke deposit returned impressive results, including 11m at a stellar 22g/t gold from 39m, with another hole delivering 19m assaying 10.51g/t gold from 28m and a third landing 10m grading a hefty 19.85g/t gold from just 16m downhole.

 

Adding another intriguing twist to the Iron Maiden acquisition is the historic Lady Mary underground mine, where production is believed to have exceeded 26,000 ounces at grades above 20g/t gold.

 

Lady Mary sits within the project's western banded iron formation (BIF), while the Iron Duke and Surprise deposits occupy the eastern formation. The project also occupies a prime stretch of the Mt Henry Shear, a major geological structure running through the southern Norseman-Wiluna Greenstone Belt, immediately north of Sinclair Gold's multi-million-ounce Mt Henry goldfield.

 

Despite its promising credentials, much of the Iron Maiden project has seen little modern exploration in the past two decades.

 

The Iron Maiden Gold Project is a compelling opportunity, having seen little exploration outside the Surprise and Iron Duke resources in the last 20 years. Sitting between historical mines in Norseman and Mt Henry, the Project presents immediate exploration upside and potential future feed for Burbanks.   Auric Mining Managing Director Mark English

 

The acquisition fits neatly into the company's stated “hub-and-spoke” strategy of transforming from an explorer into an integrated mining house. Auric is working to re-establish the Burbanks processing facility as a 600,000-tonne-per-annum hub. Securing an ore pipeline is critical to that plan.

 

Just last month, the company completed the Union Jack project near Coolgardie, boosting its global mineral resource inventory by 51 per cent to 301,000 ounces. That 102,000-ounce resource sits just 15km from Burbanks, providing another potential ore source for the centralised mill.

 

Auric has demonstrated a knack for shrewd deal-making in building out its processing capability. The company recently snapped up a substantial infrastructure package for the bargain-basement price of just $1.2 million. Management says buying equivalent new equipment would likely have cost between $15 million and $20 million, putting some serious daylight between the purchase price and replacement cost.

 

Management has proven its ability to execute on projects. Its Munda starter pit was an exceptionally successful campaign, producing 8886 ounces of gold and outperforming predictions by a whopping 46 per cent. The operation delivered record revenue of $44.8 million and a net profit after tax of $19.3 million for the half-year to June 2026.

 

Additionally, Auric’s joint venture with BML Ventures at the Jeffreys Find gold mine was another lucrative development, turning an initial investment of $1.2 million into a remarkable $16.5 million cash return. These successes have helped swell Auric’s war chest, with the company now holding $33.05 million in cash at the end of the September quarter and no corporate debt.

 

Armed with plenty of cash at bank, a clear hub-and-spoke strategy centred around its own processing facility and a growing portfolio of assets within trucking distance, the company appears to be steadily assembling the key components for a long-life gold operation.

 

The historical numbers at Iron Maiden certainly make for compelling reading. Throw in management with a track record of turning gold assets into cash and the market will likely be watching closely to see whether Auric can work its magic again and turn the project's high-grade promise into another golden payday.


Is your ASX-listed company doing something interesting? Contact: office@bullsnbears.com.au

bottom of page